Gasser HotRod Forums banner
1 - 4 of 4 Posts

·
Administrator
Joined
·
13,524 Posts
Floors can sometimes be a tough project. It's always tough to figure out if you need multiple patch panels, or just rip most of it out and start from scratch. The tunnel is almost always good, even in a very bad floor, so often it's just both sides of the tunnel or small patches. I prefer to save as much as possible, but only if there's not large holes, or a lot of cancer.
 

·
Registered
Joined
·
46 Posts
Discussion Starter · #4 ·
the front is pretty well shot, even some of the toeboard. the backs not much better. im going for compleat 2pc floor. this should keep me busy for a wile lol.........
 
1 - 4 of 4 Posts
Top